CP Executive train in Albany

CP Executive train in Albany

Wednesday, December 30, 2020

2020 Wrap Up

Wow, the my 2019 Wrap Up blog post started with the sentence "The year of 2019 will first and foremost be remembered as the year of the plague." With all due respect to my 2019 self, who was referring to Crohns disease, I must say that the year 2020 will first and foremost be remembered as the year of the plague. Some things change, and some things stay the same. Despite the global pandemic that was Covid 19...

I accomplished several things in 2020:

1.) I completed the requirements for my NMRA "Master Builder - Cars" certificate. I came into 2020 with the my first car, an O scale caboose, in pieces and two HO flatcars as warped frames. However, working from home gave me extra time during the day when I would normally be in the Office or commuting to get some work done on them. And, lunch time spent in the basement helped too. My original goal of completing "one car a year" quickly turned into "four cars before the convention" and then "all eight cars before the convention." And all earned enough merit award points (87.5), which was pretty cool. I only have three more certificates to go (Association Volunteer; Chief Dispatcher; Master Builder - Scenery) before I earn Master Model Railroader.

2.) This year I finally had a suspended ceiling installed over the layout area, and in fact over most of the basement. Because my trains were now safe from dirt and dust falling on them (and at times it was pretty substantial and just touching the ceiling joists would turn your hands black), I finally had the confidence to start building scenery without worrying that it would get damaged.

3.) I started building scenery on my primary layout. I haven't actively worked on adding scenery to my layout in likely 10 years. A lot of things were new to me, such as buying a static grass machine, playing with ground goop, and installing backdrops. But, I felt right at home using ground foam. So far, I have one scene mostly finished and another half-way done. There is still lots of detailing to do, and more structures to build, and more vehicles to add, and...

4.) On the 7.25" gauge (1/8 scale) railroad front, I wrote up an article for Live Steam and Outdoor Railroading magazine about my battery powered Boston & Maine "critter" engine and it was published in the Jan/Feb 2021 issue. While I enjoyed building the engine, and writing the article, I hope that it might inspire others who faced similar issues to what I dealt with while working on my engine.

And, I have some things to look forward to in 2021:

1.) Train Shows! True, the Amherst show in January is cancelled but it is unlikely that every show will be postponed in 2021. Specifically, I imagine that the Great Train Extravaganza in Albany will occur in December which is always a fun time. 

2.) Train Rides: some tourist trains are already operating now with limited capacity. Because of my immune system I don't want to risk even partially-crowded trains, but if the vaccine receives widespread distribution in the next six months or so then perhaps by Fall I will be able to ride trains again. And perhaps the Arcade and Attica Railroad will have their #18 steam engine assembled and running at that time. 

3.) Good Health: my Crohns disease is being managed very well through infusion treatments, and despite the Covid all around us I feel a whole lot better than I did in 2019. Yay for that! 

4.) A new Gauge 1 live steam locomotive. I won't reveal the details now, but I have had an engine on order for 18 months now and hopefully it will be delivered in the spring. 

5.) Eating Out: I normally don't like to eat out, as I would rather spend the money on trains. But, Covid has made it so that eating out is a rarity in our household. The ability to eat out again is something I am really looking forward too.

Here's to hopefully a great 2021!

Sunday, December 27, 2020

Turboliners in Albany (1988)

Last Christmas I happened to check my email and saw that Rapido was bringing out HO scale Rohr Turboliner trains. Without thinking (as is my wont) I ordered a set right away. I first picked the "late" Phase III painted set #2, but later switched my reservation to set #4 because I liked the car numbers better (petty to be sure). 

However, one thing I struggled to find online was information about when the roofs of the cars were painted black. Most of the pictures online show the trains when new, and at that time their roof's were painted white. I asked online at Railroad.net and the answers pointed to around 1987, which is a bit later than my 1984 time period. But that is okay. I rode them in the late 1980s, and likely at that point they had black roofs. Plus, I think they look sharper with the contrasting color (and it hid the exhaust grime too, something I am sure they took into account).

















I have been searching EBay for a while now for slides showing the black roofs and kept coming up empty. When they first came out people took lots of pictures of them, but I guess a decade later the magic had worn off and they were just another train to ride. Luckily, I found these two images for sale. They were taken in Albany on May 5, 1988 at Amtrak's dedicated Turboliner repair facility. It still exists today, some 30+ years later, and I see it all the time from across the Hudson River on my way in to work. Amtrak still uses it, but sadly the Turboliners are gone. The date is just a few days before my 6th birthday. I don't remember exactly when I rode them, but perhaps it was this day? Who knows?

Well, one year down, another year to wait. I can make it... I think.

Wednesday, December 23, 2020

Merry Christmas

Christmas holds a few special traditions for me. I always watch the Charlie Brown special (get the DVD... as the television version has parts edited for commercials). I like to eat holiday foods, including this year's new addition of a homemade fruitcake. And most of all, I get to set up a train around the tree. I usually do it around the beginning of December and tie it in with the Great Train Extravaganza train show. It gets me in the holiday mood. This year was extra special, as there was no train show. The below picture was taken by my lovely wife, who used her smart phone to add the snowflakes.

Our retriever Clover seemed to like the train, though she has has taken to licking the track. As discussed previously, the track was reclaimed from my grandfather's basement and it is likely 60+ years old. My wife's theory is that the iron in the track that tastes good to the dog. Maybe...

I usually pick different train sets each year to run, with the Hogwarts Express coming out nearly every other year. This year, I went with a Guilford theme with a Williams B&M "Bluebird" Geep, several D&H and B&M cars, a stock car decorated with bows I had made for a work Christmas party, and a B&M caboose. Many of these pieces were purchased from my friend Peter at previous GTE shows, though the D&H red covered hopper is a new addition that I bought recently because I felt the train needed some more festive color. In light of the news that CSX is acquiring Pan Am Railways (the successor in name to Guilford, itself the successor in name to the D&H/B&M, and Maine Central), perhaps next year I will feature a CSX consist. NOT A CHANCE! Maybe Conrail though...

The curves are 0-27 and the train sometimes struggles to get around them. The red covered hopper sure doesn't like them, and as it is the train already covers 50% of the loop. Lightweight cars are at the rear to avoid string-lining the train. My wife said the track was too large for the space, but I pointed out that the increased real estate meant more room for presents. I think that excuse worked. She also commented that the train was too big for the ceramic houses, but went silent when I pointed out the figures on the right who couldn't possibly fit into the doorways of the buildings.

And now for the really important stuff...

Matthew 1, 18-25

(18) Now the birth of Jesus Christ took place in this way. When his mother Mary had been betrothed to Joseph, before they came together she was found to be with child from the Holy Spirit. (19) And her husband Joseph, being a just man and unwilling to put her to shame, resolved to divorce her quietly. (20) But as he considered these things, behold, an angel of the Lord appeared to him in a dream, saying, “Joseph, son of David, do not fear to take Mary as your wife, for that which is conceived in her is from the Holy Spirit. (21) She will bear a son, and you shall call his name Jesus, for he will save his people from their sins.” (22) All this took place to fulfill what the Lord had spoken by the prophet:

(23) “Behold, the virgin shall conceive and bear a son, and they shall call his name Immanuel” (which means, God with us). (24) When Joseph woke from sleep, he did as the angel of the Lord commanded him: he took his wife, (25) but knew her not until she had given birth to a son. And he called his name Jesus.

MERRY CHRISTMAS to all!

Sunday, December 20, 2020

Structure - Colony Liquor (part 3)

For this building I had to find a suitable (ugly) shade of green to match the prototype. Unfortunately, there are only so many options available when using small modeler's spray paint so I had to switch to Rustoleum. I hate their spray cans, which feature tips designed to put out a maximum amount of paint. I settled on Rustoleum 2X Ultimate coverage "Satin Leaf Green" paint. 
My wife and I thought that it was a pretty good match for the color of the building, and I doubt anyone else even knows what the building looked like in 1984. I sprayed on several light coats while holding the building from the inside with my left hand completely hidden inside a large garbage bag for protection. The structure is huge, and it was awkward but it went okay. I aimed for completely coverage without spraying too much paint that would hide details or leave runs. I then set it aside to cure for a week.
Next, as I was preparing to mask the sides for the gray roof I discovered a gap in one of the sides along the top. I filled it with a micro-thin strip of styrene but it required painting that side green again, which started the drying clock all over again. Finally, I was able to move on to the roof. I masked all of the edges in preparation to painting with blue painter's tape. The extra-wide rolls are perfect for this.
I usually remove the tape as soon as I have sprayed the paint, which sometimes results in problems if I have missed an area because then I have to mask the whole building again. Here, though, the gray went on smoothly and perfectly. I used Krylon gray primer, which is really easy to work with because Krylon has wonderful tips.
I noticed that where I braced the underside of the roof the styrene had deflected a little bit and left ridges. It is quite visible with the partially-glossy primer, but I hope once weathered it won't be visible. I think I am cursed... no matter how I brace (or not) brace a structure, the styrene will warp a little.
Next, the building was sealed with Dullcote and then given a black oil paint wash. I did the roof first, focusing most on the flat areas. Every couple of minutes I would blow over the surface to break up large areas of paint. A more diluted wash might have been better.

This worked out well, but I noticed that the side facing away from me (the aisle side, sadly) had some of the black wash run down and it caused visible drips. 

So, I held the building at an angle so that green paint could only land on that side and quickly resprayed that side. Then, I was happy with the result.

The brickwork on the sides really captured the black oil paint wash and looked pretty grubby, but in parts it was a bit overdone so I then used more paint thinner to tone it down a bit. In the areas by the loading door I left it a bit darker.

I also installed a Walthers' air conditioner unit detail. Then, I went around and drybrushed brown "rust" and dirt highlights to the roof and sides of the building. I still need to redo the landscape around it, and ballast the track into the siding where I adjusted its height, but overall I am pleased with it. 

A view from the side of the building facing the backdrop which will never be seen.

Tuesday, December 15, 2020

The Quest for perfect Fruitcake

Since we aren't going out to eat very much I decided to take some of the funds that would normally be spent on dining out and instead decided to make Fruitcake, something that has been on my culinary bucket list for years. I love the stuff, and have eaten just about every type I have found (warning: the stuff from the dollar stores is vile!)

Since I haven't been working on my layout much this past week (spray paint drying and all) I decided to talk about my fruitcake. My mother has a family recipe that is pretty good but I wanted something that wasn't so dark. I also wanted lots of things I really love like colorful fruit and brandy. Casting a net online for suitable recipes, I found a recipe by King Arthur flour that seemed perfect.

The misses and I then went shopping, and I was determined to pay my own way. Thus, every ingredient (except for the spices) was purchased specifically for this project. And a good thing too, as there was practically nothing left over when the dust cleared. And I think it all cost about $50, not including the booze. I even purchased King Arthur brand flour... as a return good will gesture for their recipe. Finding the red candied cherries was very difficult and no grocery stores had them in stock. As a last resort I went to Walmart to find them. Is there a cherry shortage out there?

I started by cutting up all of the fruit and soaking it overnight with some brandy. The gallon Ziplock bag contains the results. All told, I calculated it all up and there are 4,000 calories exactly in the bag! Not exactly diet food, despite all the fruit, eh?

The next day, I beat all of the flour, eggs, sugar, and spices in a KitchenAid mixer. It was a wedding present from my parents, and likely the most important power tool in the house.

Then, all of the nuts and fruit were stirred into the batter.


At this point, I wouldn't have minded eating it with a big spoon (the beater attachment and spatula did not go into the dishwasher dirty!) but there were better things to come. In re-reading the recipe, I discovered that I needed two metal baking pans 9" x 5" and I didn't have them. I had Pyrex glass ones but they were slightly smaller. Who knew? Not wanting to risk the recipe failing at this stage, I went out and bought new pans. 

After a low, slow baking process they were cooled and then brushed with more brandy. Then, as the Italians would say, it was "Ora di mangiare" (time to eat).

All told, there were over 5,200 calories in each cake. And that didn't include the brandy that I have been brushing them with. That's 250+ calories per 1/2-inch slice. And it is so worth it! Since I don't travel and can't see many people I don't have the ability to share it. So, one will be frozen in the freezer and one will be eaten until I pass out. Even Clover might get a bite. It should be a good Christmas after all.

Saturday, December 5, 2020

A background ridge for North Menands

The area in north Menands across the tracks from my three industries contains a shallow ridge with trees running along the length of it. Just behind it, and visible through the trees, is a cemetery. I had a space of about 4-5 inches wide along the  back area of the layout reserved for this, and about a quart of left over ground goop. So, after watching football one Sunday I decided to forget my troubles and work on the layout.

Previously, I had used green florist foam as the underlying support for the hills on Cut Corner. I still had scraps lying around and I used them for this backline. In fact, the pieces I used literally were dug out from the garbage can in the garage where I had thrown them because I had incorrectly deemed them surplus and useless. But, they were just the right width and height for this project.

There were lots of gaps in the foam but that wasn't going to be a problem. I would just fill it with the ground goop. Taking a cue from my last adventure with the stuff, I removed the background Gatorfoam and covered all of the foreground areas with garbage bags to protect them from errant goop.

The ground goop went together quickly as I knew what I was doing. I just dove in with my hands and spread it out, and continually added water when necessary to get it nice and smooth. 

The material went on well and it left crags and gaps between the foam pieces that I thought looked quite natural and realistic.

I did deviate from the prototype at the edge of the layout section and built a little separation gap between the ridge on this section and the adjoining Cut Corner. It isn't too visible and perhaps a strategically placed tree will help it even more. However, portability of the layout sections is much more important to me than building a solid back ridge that would need to be cut with a saw to separate the sections down the road.

While it was still wet, I sprinkled on various shades of ground foam and ground turf. I also used real, sifted dirt and other scenery materials as well. Everything was given the same treatment as I had used on the other two sections so that they would visually work well together.

Once it all dried, I then went over it again with a misting of alcohol followed up with my matte medium. And then I ran out of both... and due to the pandemic had to order more rubbing alcohol online. It took a week to arrive, and a month to make my own matte medium, so what you are seeing now I actually did weeks ago. 

I didn't add any static grass yet, or trees, because I have to plan out the other areas and don't want my static grass to be done over various sessions and look "too patchy" or random. But, I can now put the backdrop back on and focus on more structures.

Tuesday, December 1, 2020

Problems with a gummed up curved turnout

Nearly all of the track switches on my layout have been replaced at least once. I started with Micro Engineering #6 turnouts and swapped them for Peco #6 turnouts, which proved to be more durable. However, I have one curved Shinohara/Walthers #6.5 left-hand turnout at the entrance to the staging yard. And unfortunately, over the past few months the control rod that shifted the points became stuck. It ran through a brass tube from the Caboose Industries ground throw to the switch throw bar, but during the process of adding scenery and static grass to Cut Corner some glue and water had found its way into the tube. Many applications of oil on both ends of the tube didn't help. I could force the switch back and forth and it would work, but a week later would gum up again. It was a disaster.

Knowing that a fix might involve destroying the switch, I first set out to buy a replacement. And wouldn't you know... they are discontinued by Walthers. And no online store has them. Believe me, I spent a hectic couple of hours looking. But then I went to my local hobby store and they had several just sitting in a pile, brand new in their box, at a great price. Doh! I bought one immediately.

Next, I decided to see if I could trim the tube shorter on both ends (thus removing the glued-up bits) and run a new wire through it. A Dremel tool made quick work of it, but studying the old control rod revealed that rust and gunk had permeated at least 4 inches into the tube, which meant that no amount of oil I had been applying would ever have reached the problem area. And, I didn't dare reuse the rod. So, it was destined to remain in situ.

Unfortunately, the hill it passed through was pretty solidly built. It had a hard, ground goop shell that wasn't easily punctured soo running another tube wouldn't be easy. I first tried bending a tube around the hill but the angle that it approached the switch's throw rod was at an angle and that changed the length of the control rod's requirement distance to move the points. An HO scale ground throw wouldn't shift them enough, and an O scale one was way too much. 

A second option I considered was drilling a hole through the hill with an extra-long drill bit, and a third plan was cutting a channel from the top which would later need to be patched. Neither sounded fun. So, in the end I remounted one of my Tortoise machines under the turnout.

I still have the brand new switch, which I will keep in case this one breaks. I had trimmed so much of the throw rod away on both sides that there wasn't an easy place to drill a hole for the control rod to connect to. That is a lesson for next time: always leave the throw rod long enough on both sides for emergencies.

Due to the location of cut corner, these repairs were easily reached by lifting away the lightweight backdrop. 

I will eventually come back and patch the ballast and scenery, perhaps when I add the trees, but for now the switch is working again and I can turn my attention to something else.